Dismantling of production units and areas within operating refineries, as well as dismantling and demolition of entire refineries. In addition, Lezama has worked on the design, commissioning and operation of a low-temperature thermal desorption plant for hydrocarbon-contaminated sludge at the Petronor refinery in Bizkaia.
FEATURED PROJECTS
DISMANTLING OF PDL UNIT AND TANKS
Facility: Dismantling of the former Cepsa PDL unit at the Gran Bilbao facilities, initiating urban development in the region.
Client: CEPSA
Duration: 12 months
Location: Barakaldo, Bizkaia
Area: 50.000 m2
DECOMMISSIONING OF TANKS AND THERMAL DESORPTION PLANT
Facility: Demolition of the tanks at the Petronor refinery in Bizkaia, as well as the remediation of the soils in its basins through the operation of a low-temperature thermal desorption plant.
Client: PETRONOR
Duration: 6 months
Location: Muskiz, Bizkaia
Area: 75.000 m2
DISMANTLING OF HYDROCARBON TANKS
Facility: Dismantling of tanks and auxiliary installations of a hydrocarbon logistics plant at sea level.
Client: CLH
Duration: 3 months
Location: Mahón, Menorca
Area: 750 m2
DECOMMISSIONING OF COGENERATION PLANT AND ANCILLARY FACILITIES
Facility: Cogeneration plant at the Ercros chemical production facility.
Client: Ercros
Duration: 4 months
Location: Tarragona, Cataluña
Area: 6.000 m2
DEMOLITION OF THERMAL POWER PLANT - PUERTOLLANO REFINERY REPSOL
Facility: Demolition of the refinery’s old thermal power plant and the reactor house of the auxiliary building.